Starlit Stratus, 1st Place Winner, LAGI 2019 Abu Dhabi
TEAM: Sunggi Park
TEAM LOCATION: Long Island City (NY), USA
ENERGY TECHNOLOGIES: solar photovoltaic, water harvesting with hygroscopic materials
ANNUAL CAPACITY: 2,484 MWh
Sun Flower, 2nd Place Winner, LAGI 2019 Abu Dhabi
TEAM: Ricardo Solar Lezama, Viktoriya Kovaleva, Armando Solar
TEAM LOCATION: San Jose (CA), USA
ENERGY TECHNOLOGIES: translucent solar photovoltaic and gravity storage
ANNUAL CAPACITY: 350 MWh
Cloud Field, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Ignacio Martí
TEAM LOCATION: London, United Kingdom
ENERGY TECHNOLOGIES: organic photovoltaic (OPV)
ANNUAL CAPACITY: 1,172 MWh
Crack in the Ground, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Fernando Landeros, Nicolás Vidal
TEAM LOCATION: Santiago, Chile
ENERGY TECHNOLOGIES: solar photovoltaic with pumped hydro storage
ANNUAL CAPACITY: 1,400 MWh
Dandelion Journey, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Riccardo Tronci, Yu Feng, Mihelaimu Akram, Tang Jieyu
TEAM LOCATION: Muravera, Italy
ENERGY TECHNOLOGIES: organic photovotaic (OPV), kinetic energy harvesting from wind
(monolayer MoS2 piezoelectric), high-altitude wind power (HAWP) kite
ANNUAL CAPACITY: 800 MWh
Diurnal Shadow, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Riccardo Mariano
TEAM LOCATION: Berlin, Germany
ENERGY TECHNOLOGIES: thin-film solar photovoltaic (CIGS) Avancis PowerMax Skala, or similar
ANNUAL CAPACITY: 400 MWh
expoSE, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Cesare Cardia, Mauro Breda
TEAM LOCATION: London, United Kingdom
ENERGY TECHNOLOGIES: planar optical micro-tracking solar panels, CIGS solar panels
ANNUAL CAPACITY: 4.500 MWh
Following Eye, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Yuanjia Chen, Enming Zhang, Jialin Wu, Yuanjia Chen, Rizqa Uswah, Emiliano Guzman
TEAM LOCATION: Shanghai, China
ENERGY TECHNOLOGIES: organic photovoltaic (OPV)
ANNUAL CAPACITY: 200 MWh
Following Eye, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Joo Hyung Oh, Jae Ho Yoon, Su In Kim, Sunjae Yu, Hyuksung Kwon
TEAM LOCATION: Glendale (CA), USA
ENERGY TECHNOLOGIES: concentrated solar power (CSP) thermal
ANNUAL CAPACITY: 9,500 MWh
Masdar Calligraphy, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Alfio Faro, Davide Persanti
TEAM LOCATION: Paris, France
ENERGY TECHNOLOGIES: color laminated solar photovoltaic, vertical axis wind turbine
ANNUAL CAPACITY: 1,250 MWh
Moving Shadows, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Lu Chao, Weng Shenxia
TEAM LOCATION: Guangzhou, China
ENERGY TECHNOLOGIES: solar photovoltaic
ANNUAL CAPACITY: 2,000 MWh
Museum of the Seven, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Ahmed Abdelwahab Ahmed
TEAM LOCATION: Dubai, United Arab Emirates
ENERGY TECHNOLOGIES: solar photovoltaic, organic photovoltaic, solar ink
ANNUAL CAPACITY: 3,000 MWh
Nest, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Robert Flottemesch
TEAM LOCATION: Baltimore (MD), USA
ENERGY TECHNOLOGIES: mono-crystalline bifacial PERC solar modules with module level DC optimization
ANNUAL CAPACITY: 6,633 MWh
Polychromatic Courtyard, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Sung Goo Yang
TEAM LOCATION: Jersey City (NJ), USA
ENERGY TECHNOLOGIES: translucent thin-film photovoltaic
ANNUAL CAPACITY: 5,000 MWh
Renewable Oasis, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Kyriakos Chatziparaskevas
TEAM LOCATION: London, United Kingdom
ENERGY TECHNOLOGIES: dye-sensitized solar cells (DSSC) laminated in ETFE sheets, piezoelectric energy harvesting (wind and pavement)
ANNUAL CAPACITY: 500 MWh
Solar Cloud, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Sinan Gunay, Nurhayat Oz
TEAM LOCATION: Istanbul, Turkey
ENERGY TECHNOLOGIES: carbon reinforced woven mesh with thin-film photovoltaic
ANNUAL CAPACITY: 2,000 MWh
Solar Exploitation, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Xiabing Lin, Liyao Hu
TEAM LOCATION: Shanghai, China
ENERGY TECHNOLOGIES: solar photovoltaic, water harvesting
ANNUAL CAPACITY: 3,500 MWh
Solar Present, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Miguel Otero Fuentes, Edlyn García La Torre
TEAM LOCATION: New York City, USA
ENERGY TECHNOLOGIES: solar photovoltaic, solar distillation of water
ANNUAL CAPACITY: 1,500 MWh and 2 million liters of water
Source Re:Source, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Jacob Kwan, Yashi Sikaria
TEAM LOCATION: Santa Clara (CA), USA
ENERGY TECHNOLOGIES: dye-sensitized solar cells (DSSC), wind sail freewheel generator
ANNUAL CAPACITY: 300 MWh
Spark, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Antonio Maccà
TEAM LOCATION: Torreglia, Italy
ENERGY TECHNOLOGIES: linear Fresnel reflector solar thermal
ANNUAL CAPACITY: 1,800 MWh
Analemma, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Ivana Jelic
TEAM LOCATION: Belgrade, Serbia
ENERGY TECHNOLOGIES: translucent flexible solar thin-film
ANNUAL CAPACITY: 600 MWh
The Oasis: an Integrated Ecosystem in the City, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Jean-christophe Petillault, Antonin Hebert
TEAM LOCATION: Paris, France
ENERGY TECHNOLOGIES: organic photovoltaic (OPV) by ASCA or similar, microbial electrolysis
ANNUAL CAPACITY: 1,200 MWh
The LIT: Light Infinite Transformation, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Massimo Edolo Marinelli, Tatiana Mardare, Daniela Laura Buruiana
TEAM LOCATION: Milan, Italy
ENERGY TECHNOLOGIES: solar photovoltaic, water harvesting
ANNUAL CAPACITY: 4,000 MWh
The Oasis, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Aziz Khalili, Puya Khalili, Iman Khalili
TEAM LOCATION: Vancouver, Canada
ENERGY TECHNOLOGIES: PVT solar panels, absorption chiller
ANNUAL CAPACITY: 7,200 MWh and 18 million liters of drinking water
The Pulse, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Fatima Almheiri, Haya Mohammed Kamel, Moustafa Mahmood, Essam Abbas Essa, Joseph Limeta, Husam Ziad
TEAM LOCATION: Dubai, United Arab Emirates
ENERGY TECHNOLOGIES: monocrystalline silicon photovoltaic, piezoelectric energy harvesting pavers
ANNUAL CAPACITY: 5,250 MWh
The Solar Compass, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Santiago Muros Cortés
TEAM LOCATION: Buenos Aires, Argentina
ENERGY TECHNOLOGIES: concentrated solar power
ANNUAL CAPACITY: 4,000 MWh
The Solar Seesaw, shortlisted, LAGI 2019 Abu Dhabi
TEAM: Luca Fraccalvieri, Ahmad Nouraldeen
TEAM LOCATION: Santeramo in Colle, Italy
ENERGY TECHNOLOGIES: flexible thin-film solar photovoltaic (CZTS) by Crystalsol™ or similar
ANNUAL CAPACITY: 2,800 MWh
Unexpected Scenarios shortlisted, LAGI 2019 Abu Dhabi
TEAM: Riccardo Daniel, Kei Shiho, Francesco Feltrin
TEAM LOCATION: Tokyo, Japan
ENERGY TECHNOLOGIES: solar thermal with Stirling heat engine and calcium hydride reactor with hydrogen energy storage
ANNUAL CAPACITY: 175 MWh
LAGI 2019
Abu Dhabi
Above is a small sampling of LAGI 2019 submissions including the shortlist as chosen by the selection committee.
Jurors
H.E. Eng. Fatima Alfoora Alshamsi
Assistant Undersecretary for Electricity and Future Energy
in the United Arab Emirates Ministry of Energy and Industry; CEO 24th World Energy Congress Organizing Committee
Yousef Ahmed Baselaib
Executive Director Sustainable Real Estate
Masdar
Lukas Sokol
Head, City Design, Sustainable Planning
Masdar
Chris Wan
Head, Design Management
Masdar
Tim Mollette-Parks
Landscape Architect
Associate Principal, Mithun
Zac Cirivello
Operations Manager, Fly Ranch
Burning Man Project
Hala El Akl
Architect & Urban Planner
Director, PLP Architecture, London
Raya Ani
Founder | Design Director
RAW-NYC Architects
Daniel Glaessl
Design Director
Gensler Silicon Valley
Emily Doherty
Director
The Christo and Jeanne-Claude Award
LAGI 2019
site typology: city portal
LAGI 2019 Abu Dhabi—Return to the Source—invited creatives to design an iconic work of art for a landmark site within Masdar City, Abu Dhabi using renewable energy technology as a medium of creative expression to provide on-site energy production consistent with the master plan of the city.
Masdar is the Arabic word for “source.” As the name of Abu Dhabi’s multifaceted renewable energy company and most ambitious low-carbon development, it is a reference to the Sun, the source of energy that sustains life on Earth, drives the wind and waves, and that over millions of years powered the transfer of ancient carbon dioxide out of the atmosphere and into the ground, creating a climate habitable to humans.
“Source” also has meaning within the context of the Land Art Generator initiative, which was established in the UAE in 2008. The first LAGI design competition was supported by Masdar and the award ceremony took place at the 2011 World Future Energy Summit, where eight years later the 2019 LAGI design competition is launched.
This year’s special edition is in partnership with the 24th World Energy Congress, the largest and most influential global energy event, that has been a forum for innovation and dialogue on energy issues for 95 years. The 24th World Energy Congress will be the venue for the exhibition of 28 shortlisted projects designed for Masdar City.
LAGI 2019 Publication
The LAGI 2019 book featuring 65 submissions was published with Prestel (a division of Random House) and was released in January 2020 at the World Future Energy Summit.
Sponsor
LAGI 2019 was sponsored by Masdar
Partner
LAGI 2019 was held in partnership with / and was an official side event of the 24th World Energy Congress